Search

Type: Project
Date: 31-05-2006
First use of the Xbloc special toe unit: Xbase. This modified Xbloc, proves to be a stable solution for the toe construction of an...
Type: Project
Date: 30-06-2006
The rehabilitation and extension works have been carried out by Lagan Construction. The design was prepared by RPS. Lagan Construction proposed to...
Type: Project
Date: 31-10-2007
The design has been done by RPS Consulting Engineers. Construction has been done by SIAC. The breakwaters are armoured by Xbloc armour...
Type: Project
Date: 30-04-2008
The total length of the shore protection is 3 km, and as main armour layer 25,000 Xblocs with a size of 0.75 m3 have been applied....
Type: Project
Date: 30-06-2008
The main breakwater of Port of Poti dates back to 1873. Today it has a length of 1800 m and is covered by concrete cubes. A major part of the main...
Type: Project
Date: 31-07-2009
Type: Project
Date: 31-10-2009
The project site is a Green Field location. The harbour is protected by two breakwaters and is designed for 125 ft. fishing vessels. The breakwaters...
Type: Project
Date: 28-02-2010
The 8 m3 Xblocs on Guam are cast using the horizontal casting method. With this method one nose of the Xblocs is below ground level during...
Type: Project
Date: 31-01-2011
2D model testing has been carried out at the laboratory of Delta Marine Consultants in Utrecht, The Netherlands.
Type: Project
Date: 31-03-2011
The production of the Xblocs is carried out by BAM Decorient, Indonesia. The Xblocs are produced in the port of Cigading, Java, and loaded onto...
Type: Project
Date: 31-08-2011
The size of the Xblocs to be applied is 3 m3. The Xblocs are cast in steel moulds, using the horizontal casting method. The mould consists of two...
Type: Project
Date: 30-09-2011
The breakwater consists of a steel cofferdam structure with Xbloc concrete armour on a rock core on the outside. On the main breakwater Xblocs of 5,...
Type: Project
Date: 30-09-2011
The size of the Xbloc armour units is 3 m3. the Xblocs are cast in Abu Dhabi at Emarat Europe and transported by barge to the offshore islands. There...
Type: Project
Date: 31-12-2011
The breakwater is low crested. The front and rear armour of the breakwater trunk consists of 3 m3 Xblocs. The breakwater head is armoured by 4 m3...
Type: Company
Date: 20-06-2012
Type: Company
Date: 20-06-2012
Type: Company
Date: 20-06-2012
Type: Company
Date: 20-06-2012
Type: Company
Date: 20-06-2012
Type: Company
Date: 20-06-2012

Pages