Breakwater at Champerico Guatemala Completed
15 september 2008
In August the last Xblocs have been placed on the breakwater at Champerico in Guatemala. 1260 Xblocs have been placed in three months time.
The 500 m long breakwater will protect the new fishing port. In 2009 this new port will be in operation.
