Xbloc - Effective ware protection for breakwaters and shores

Breakwaters Dikkowita, Sri Lanka

A new Fishing Harbour has been built 10 kilometre north of Colombo, Sri Lanka. The harbour is constructed by BAM International, the design is done by Delta Marine Consultants.

The project site is a Green Field location. The harbour is protected by two breakwaters and is designed for 125 ft. fishing vessels. The breakwaters are partly built on an existing sandstone reef. Both breakwaters have a concrete crown wall. The total length of the breakwaters is more than 1 kilometre. The head of the main breakwater is located at -7.5 m MSL. The Xbloc production cycle is two Xblocs per mould per day.

2D model testing has been carried out at the laboratory of Delta Marine Consultants in Utrecht, The Netherlands. 3D model testing has been carried out at LHI in Sri Lanka

Project Milestones

Start of casting: August 2009
Start of placement: October 2009
1700 Xblocs produced: November 2009
Start placement 3.6 m3 Xbase units: March 2010
Xbloc placement near completion: March 2011

Project Details 

Hs: 3.3 m
Tp: 11-16 s  
Length of breakwaters: 1 km
Size of Xblocs: 1.5, 2.0 and 4.0 m3
Number of units: 5,700

 

 

 

Project pictures

  • Freshly cast Xbloc at Dikkowita Sri Lanka
  • Placement Xbloc toe, Sri Lanka
  • Xbloc harbour entrance breakwaters, Dikkowita, Sri Lanka
  • Xbloc casting on elevated roadway at Dikkowita
  • Crown wall Xbloc breakwater at Dikkowita, Sri Lanka
  • Main breakwater at Dikkowita, Sri Lanka, with Xblocs
  • Casting of Xbase blocks at Dikkowita, Sri Lanka
  • Xblocs breakwater port entrance Dikkowita, Sri Lanka
  • Xbloc breakwater on reef, Dikkowita, Sri Lanka
  • Dikkowita Xbloc placement, Sri Lanka