A new Fishing Harbour is being built 10 kilometre north of Colombo, Sri Lanka. The harbour is constructed by BAM International, the design is done by Delta Marine Consultants
The project site is a Green Field location. The harbour is protected by two breakwaters and is designed for 125 ft. fishing vessels. The breakwaters are partly built on an existing sand stone reef. Both breakwaters have a concrete crown wall. The total length of the breakwaters is more than 1 kilometre. The head of the main breakwater is located at -6.5 m MSL. The Xbloc production cycle is two Xblocs per mould per day.
| Start of casting: | August 2009 |
| Casting of 2 Xblocs/mould/day | September 2009 |
| Start of placement | October 2009 |
| 1700 Xblocs produced | November 2009 |
| Hs: | 3.3 m |
| Tp: | 11 - 16 s |
| Length of breakwaters: | 1000 m |
| Xbloc sizes: | 1.5; 2.0; 4.0m3 |