The first Xbloc® application was executed in West Java, Indonesia. The shore protection in front of a petrochemical site needed to be rehabilitated in a short time. The contractor proposed to apply Xbloc®.

Horizontal casting method

The armour units were produced using the horizontal casting method. This way the units are casted with the nose in the ground. This casting method, with low investment costs was an effective solution for this project.

Project Milestones

2004: Project finished

Project Details

Hs 3.3 m
Length of shore protection 300 m
Size of Xblocs® 1 m3

 

 

 

 

 

Project pictures

  • west-java-indonesia-Xbloc shoreprotection
  • Xbloc shore protection West Java